Home ] Up ] Products ] About TFS ]


     CND-200 PROCESSOR  
     
     
     
  SOLUTION TIMES  
Location Feet Time @ 200 ft/min
    (minutes)
     
Feed Elevator (Differential) 475 2.38
Prebath (minimum) 16 0.08
Prebath (maximum) 36 0.18
Spray Wash 49 0.25
Developer 615 3.07
Stop  205 1.02
Wash 205 1.02
Wash 205 1.02
Bleach 615 3.07
Wash 205 1.02
Fix 410 2.05
Wash 205 1.02
Wash 205 1.02
Stabilizer 205 1.02
Dry Box 1895 9.48
Takeup Elevator (Differential) 300 1.5


4725 Calle Quetzal
Camarillo, CA 93012-9101
tel: 805-384-9470
fax: 805-384-9471
email: techfilm@techfilmsystems.com